Flashing Plate mounting system is a common solution for asphalt tile and flat tile rooftop, its main benefit is the water resistance. On the flashing plate, the connecting hole is designed with a little bulge, which allows the rainwater flowing over the plate avoiding leaking through the connecting hole.
Product Origin:
Fujian, ChinaColor:
SilverLead Time:
15-20 daysApplication
Tile RoofMax. Wind Speed:
60m/sMax. Snow Load:
1.4 KN/m²Warranty:
10 YearsService Life:
>25 YearsStandard:
AS/NZS 1170Product Introduction
Flashing Plate mounting system is a common solution for asphalt tile and flat tile rooftop, its main benefit is the water resistance. On the flashing plate, the connecting hole is designed with a little bulge, which allows the rainwater flowing over the plate avoiding leaking through the connecting hole.
The main parts are Flashing Plate, L Feet, Rail, Rail Connector, Mid Clamp and End Clamp.
Product Parameters
Brand | ZIYUAN |
Material | AL6005/T5 & SUS304 &SUS410 |
Surface Coating | Anodized |
Design Code | JIS C 8955 2017 |
Standard | AS/NZS 1170 |
Max. Wind Speed | 60m/s |
Max. Snow Load | 1.4KN/m² |
Warranty | 10 years |
Service Life | >25 years |
Mounting Type | Roof Mounting |
Tilt Angle | Other |
Mounting Parts Details
The main parts are Flashing Plate, L Feet, Rail, Rail Connector, Mid Clamp and End Clamp.
Install Steps
1.
Open the tiles to a certain space for the Flashing Plate to enter, then cover the tiles.
2.
Install the L Feet on the bump of the Flashing Plate, drill the screw into the roof beam below.
3.
Install the Rail on the L Feet, lock the bolt tightly and make sure all Rails are in same level.
4.
Install the solar panel on the Rails with the End Clamp and Mid Clamp, lock the bolt tightly.
Main Features
•√ Good performance of waterproof with little humb designed on the thin flashing plate.
•√ Being thin but durable, the flashing plate is able to stay almost seamless installed into the tiles.
•√ Simple components optimized easy and fast installation to save material,money, labor and time cost.
Packaging & Shipping
Our Advantages
ZIYUAN has its own factory with more than 100 skilled and experienced workers, the production line is strictly in accordance with high standards and attach great importance to quality control and inspection.
The first-class production engineers, technicians and R & D team offer innovative design and reliable solution to customers based on more than 8 years of experience.
ZIYUAN has an excellent sales team, can quickly respond to customer inquiries and provide professional advice.
FAQ
FAQ about the product
1/
How far apart should solar roof hooks be placed ?
Generally, the first and last roof hook must be within 0.2m of the end of the mounting rail. The distance between the roof hooks should take many factors into account and the beam distance plays a decisive role as the hooks usually needs to be nailed to the beam.
2/
How high should solar panels be off the roof?
Higher off the roof will tend to have better airflow and keep the panels cooler. Cooler panels will generate more, typically something like 0.4% per deg C. As long as you don't mind the look, and the wind loads are accounted for in the rack design, higher is fine.
FAQ about company
01 Q: Do you have your own factory?
A: ZIYUAN has own factory with more than 100 skilled and experienced workers the production line is strictly in accordance with high standards and attach great importance to quality control and inspection.
02 Q: Do you have an experienced design team?
A: Of course,our first-class production engineers,technicians and R&D team offer innovative design and reliable solution to customers based on more than 8vears of experiences.
03 Q: Do you have any experience in OEM?
A: Yes, ZIYUAN has provided OEM service design service and buyer label service for more than10 years.
04 Q: Have your products been certified?
A: Yes the products of ZIYUAN have been certified by ISo, sGS, TUV and AS/NZS1170.2
05 Q: How long is your delivery time?
A: It depends on actual order quantity and your special requirements.Generally, it will be 1-2weeks.
06 Q: How is your payment term?
A: If total amount is less than US$5000, we need 100% in advance; if total amount is more than US$5000, we need 30%T/Tin advance and balance before shipment. Other payment term can also be negotiated based on actual.
Tags :