
Flat Metal Roof Mounting Structure
The ZIYUAN flat metal roof mounting structure is a highly efficient PV engineering solution designed for flat or low-slope corrugated metal roofs. Utilizing a robust column base design, it elevates the solar array securely above the roof surface.
The main material of this mounting structure is high-grade aluminum alloy AL6005-T5 with a fully anodized surface. It exhibits strong corrosion resistance, making it perfect for both residential projects and large-sized commercial photovoltaic power plants.
Featuring high pre-assembly characteristics and strict waterproofing integration, this structure drastically reduces on-site installation time and labor costs while guaranteeing long-term system stability.
Specification:
| Brand | ZIYUAN |
| Material | AL6005/T5 & SUS304 |
| Surface Coating | Anodizing |
| Roof Type | Flat Metal Roof / Corrugated Iron |
| Design Code | JIS C 8955 2017 |
| Standard | AS/NZS 1170 |
| Warranty | 15 years |
| Service Life | 20 years |
Material Parameters:
System Components (BOM):
This system is designed with high-quality elements and minimal accessory types. The core kit includes the Column Bases, AR41 Aluminum Rails, AR41 Rail Connectors, End Clamps, Mid Clamps, Earthing Plates, and Grounding Lugs.

Installation Guide
Step 1: Installation of Column Base
Install the Column Base on the roof sheet by drilling the base with ST6.3*25 self-tapping screws (each base requires 2 screws). The distance between the columns should match the design drawing.
Waterproofing Crucial Note: To ensure maximum waterproof performance, apply waterproof glue on the roof sheet under the base before installation. After drilling, applying waterproof glue over the screws is required. Sealing the entire edge of the base with glue is also highly recommended.

Step 2: Installation of AR41 Rail
First, insert the AR41 Rail Connector into two rails to extend the length, and lock the bolts tightly. Then, install the extended Rail onto the Column Bases. Ensure the rail is perfectly parallel to the roof surface before tightening the bolts.


Step 3: Installation of Solar Panels
Place the Solar Panels securely on the AR41 Rails. Use the Aluminum End Clamps and Mid Clamps (integrated with Earthing Plates) to fix and fasten the panels tightly in place.

Step 4: Installation of Grounding Lug
Install a Grounding Lug on the exposed end of each AR41 Rail to ensure proper electrical grounding of the entire system.

Warranty & Quality Guarantee:
ZIYUAN Energy guarantees continuous power generation for 25 to 30 years.
The structure offered by Ziyuan Energy has a 25-year service life and we offer a solid warranty for 12 years.
The power output decreases by 2% in the first year and then by 0.45% each year from the second year through the 30th year.
This long-term durability allows clients to make sustained investments and plan stable business operations.
Product Package
Professional packaging ensures all carport components and accessories reach your site in perfect condition.

Why Choose Ziyuan Energy
1. Own Factory & Strict QC
Ziyuan has its own factory with more than 100 skilled and experienced workers, ensuring every aluminum profile meets top industrial standards.

2. Experienced Engineer Team



3. Professional Service







