Products

Professional solar mounting manufacturer with 12+ years of expertise. Delivering reliable, economical, and efficient solutions to 5200+ projects across 80+ countries.

Ground Solar Mounting Structure for Flat Roof & Open Field

The main material of this mounting structure is aluminum alloy AL6005-T5. The surface of the product has been anodized. The product is suitable for installation of large and medium-sized photovoltaic power plants.

Item: Ground/Flat Roof Mounting Structure
Payment: T/T, PAYPAL, Western Union, L/C
Product Origin: China,Fujian
Color: Silver
Shipping Port: XIAMEN, CHINA
Lead Time: 7-15 DAYS, NORMALLY
Brand: Ziyuan
Certification: CE, SGS, ISO, JIS
Material: Aluminum Alloy AL6005-T5

Ground-mounted solar mounting structure system installed on concrete block foundations for PV panels.

Ground Solar Mounting Structure

The main material of this mounting structure is high-grade aluminum alloy AL6005-T5. The surface of the product has been professionally anodized to provide extreme corrosion resistance.

This system is ideally suited for the installation of large and medium-sized photovoltaic power plants. It features high pre-assembled characteristics, which significantly saves on-site installation time and labor costs.

High-quality design elements and a minimal variety of accessories make it an efficient and robust solution for photovoltaic engineering projects on ground or flat roof environments.

Specification:

Brand ZIYUAN
Material AL6005/T5 & SUS304
Surface Coating Anodizing
Tilt Angle Range 10~15°, 15~30° & 30~60°
Design Code JIS C 8955 2017
Standard AS/NZS 1170
Wind Speed 60m/s
Snow Load 1.4KN/m²
Warranty 12 years
Service Life 25 years

Components:

Exploded component view and 12-item parts list for a ground solar mounting structure.

Installation Guide

1 Installation of Cement Blocks

1.1 Make the Cement Blocks as per below size. The embedded reinforcement M12-300 shall be exposed for 30mm and the distance between two is 124mm.

Dimensional diagram for solar cement block foundations detailing embedded reinforcement spacing and height requirements.

1.2 Position the Cement Blocks according to the distance marked in design drawings.

Layout plan showing the positioning and distances for concrete foundation blocks in a ground solar array.

2 Installation of Beam and Column

2.1 Fix the H Connector according to below dimensions, fasten the M8-20 bolt tightly.

Installation guide showing the attachment of H-connectors to solar support beams using specific dimensions.

2.2 Connect the Support Beam (square pipe) L205, L1400 & L935 with H Connector using M10-80 bolt, connect these Support Beam with Base using M10-90. There is no need to fasten the M10-80 and M10-90 bolt too tightly for now.

Connecting square pipe solar support beams with H-connectors and structural bases for the mounting structure.

2.3 Install the Beam & Column on the Cement Block, using the embedded reinforcement to fasten well.

Installing solar mounting columns onto concrete block foundations using embedded reinforcement bars.

2.4 Adjust and ensure that all Beams are in same level then fasten all bolts tightly.

Ensuring all solar mounting beams are level before final tightening of the ground structure.

3 Installation of Back Bracing

Connect the Back Bracing with the Support Beam L935 using M8*110 bolt, fasten the bolts tightly.

Installation of diagonal back bracing to the solar support beams using M8x110 bolts for structural reinforcement.

4 Installation of Rail

4.1 Rail connection: Firstly, insert the Rail Connector into one Rail, and drill ST6.3*19 screws (2 per side). Then, insert the connector into another Rail and fasten with screws. If necessary, drill two more screws into the bottom.

Aluminum solar rail connection process showing the insertion of a connector and ST6.3*19 screw fixing points.

4.2 As the dimensions marked on the design drawings, install the Rail on the Beam with Rail Clamp, fasten the bolt tightly.

Securing aluminum solar mounting rails to the main support beams using specialized rail clamps and bolts.

5 Installation of Solar Panels

Install the Solar Panels on the Rails, use the End Clamp and Mid Clamp to fix and fasten the bolt tightly.

Fixing solar panels to the mounting rails using aluminum end clamps and mid clamps with earthing plates.

Warranty & Service:

ZIYUAN Energy guarantees continuous power generation for 25 to 30 years.

The structure offered by Ziyuan Energy has a 25-year service life and we offer a solid warranty for 12 years.

The power output decreases by 2% in the first year and then by 0.45% each year from the second year through the 30th year.

This long-term durability allows clients to make sustained investments and plan stable business operations.

Product Package

Professional packaging ensures all carport components and accessories reach your site in perfect condition.

Ziyuan factory warehouse and product packaging

Why Choose Ziyuan Energy

1. Own Factory & Strict QC

Ziyuan has its own factory with more than 100 skilled and experienced workers, ensuring every aluminum profile meets top industrial standards.

Inside Ziyuan factory with strict quality control

2. Experienced Engineer Team

Gamcorp engineering certification
OHSAS 18001:2007 certificate
ISO 9001:2015 certification

3. Professional Service

Ziyuan business and technology department meeting

Request a Quote Today

Request a Quote

Technical solutions and fast quotations for your project.

Request a Quote

Technical solutions and fast quotations for your project.