

Roof Solar Mounting Structure
The ZIYUAN roof solar mounting structure is a highly adaptable PV engineering solution. By offering both Triangle Rack elevation and direct Metal Roof Clamp options, it accommodates various architectural layouts for commercial and residential metal roofs.
The main material of this mounting structure is high-grade aluminum alloy AL6005-T5 and stainless steel SUS304. The fully anodized surface ensures exceptional corrosion resistance, providing long-term reliability for large and medium-sized photovoltaic power plants.
Featuring highly pre-assembled components, this structure drastically minimizes accessory complexity. It offers structural flexibility while securely anchoring directly to the roof’s C purlins, saving installation time and cost greatly.
Specification:
| Brand | ZIYUAN |
| Material | AL6005/T5 & SUS304 |
| Surface Coating | Anodizing |
| Mounting Method | C Purlin Direct Fixing |
| Design Code | JIS C 8955 2017 |
| Standard | AS/NZS 1170 |
| Warranty | 12 years |
| Service Life | 25 years |
Material Parameters:
System Components (BOM):
This versatile system includes all necessary components for both elevated and flush mounting. Key parts include the Triangle Rack Beam & Columns, Bases, Metal Roof Clamps, AR55 Rails, Rail Connectors, End/Mid Clamps, and Grounding hardware.

Installation Guide
Step 1: Installation of the Base
a. Use an electric hand drill to make four Φ9 holes through the roof surface directly into the C purlins, following the exact spacing shown in the design drawing.

b. Secure the Base onto the C purlins using the M8*60 structural bolts.

Step 2: Installation of the Triangle Rack
Install the support columns of the Triangle Rack onto the firmly anchored Base, and lock them securely using the M8*60 bolts.

Step 3: Installation of the Rail
a. Use the Rail Connectors to join and extend the Aluminum Rails. Secure the joints with M8*10 bolts.

b. Place the joined Rail onto the upper beam of the Triangle Rack, and fix it permanently using the specified Rail Clamps.

Step 4: Installation of the Metal Roof Clamp (Alternative Direct Fix)
a. Use an electric hand drill to make two Φ9 holes targeting the C purlins beneath the roof.

b. Secure the Metal Roof Clamp directly onto the C purlins using the M8*60 bolts.

Step 5: Installation of Solar Panels
Position the Solar Panels onto the structural Rails or directly on the Metal Roof Clamps. Utilize the Aluminum End Clamps and Mid Clamps to fasten the modules tightly.


Warranty & Quality Guarantee:
ZIYUAN Energy guarantees continuous power generation for 25 to 30 years.
The structure offered by Ziyuan Energy has a 25-year service life and we offer a solid warranty for 12 years.
The power output decreases by 2% in the first year and then by 0.45% each year from the second year through the 30th year.
This long-term durability allows clients to make sustained investments and plan stable business operations.
Product Package
Professional packaging ensures all mounting components and accessories reach your site in perfect condition.

Why Choose Ziyuan Energy
1. Own Factory & Strict QC
Ziyuan has its own factory with more than 100 skilled and experienced workers, ensuring every aluminum profile meets top industrial standards.

2. Experienced Engineer Team



3. Professional Service









