Ground Screw Foundation mounting system V1

The Ground Screw Foundation Mounting System V1 is an innovative, eco-friendly solution designed for rapid deployment in ground-mounted solar projects. By eliminating the need for concrete foundations, this system significantly reduces installation time and environmental impact. Constructed from high-strength hot-dip galvanized steel (Q235B) and anodized aluminum, it offers exceptional stability and corrosion resistance for over 25 years. Its modular design and versatile spiral pile foundation make it suitable for a wide range of soil conditions and terrains.

Ground screw foundation solar mounting system V1 for fast and stable ground PV installations.

Brand ZIYUAN Tilt Angle Range 0~60°
Material  AL6005/T5 & Q235B & SUS304 Wind Speed 60m/s
Surface Coating Anodizing & Hot-galvanizing Snow Load 1.4KN/m²
Design Code JIS C 8955 2017 Warranty 10years
Standard AS/NZS 1170 Service Life 25years

 

Ground Screw Foundation mounting system can be applied to medium and large scale solar PV projects. It is designed strictly according to clients’ requirements and the necessary conditions such as the optimal angle, minimum ground clearance, max wind speed, snow load and so on. The installation is easy and can save much time and labor cost. The main parts are Ground Screw, Pre-assembled Beam, Back Bracing, Rail, Rail Clamp, Rail Connector, Mid Clamp and End Clamp. According to the different shapes of Pre-assembled Beam, this kind of mounting system can be divided into A type, N type, VI type and W type. 

Main parts list for V1 ground screw mounting system showing spiral piles, rails, and connection brackets.

 

INSTALLATION STEPS

 

1.Piling the Ground Screw in the correct position as planned.
2.Install the Pre-assembled Beam on the flange plate of Ground Screw, ensure all Beams are in same level.
3.Install the Back Bracing between the Rear Columns of Pre-assembled Beam, lock the bolt tightly.
4.Install the Rail on the Beam with the Rail Clamp, lock the bolt tightly and ensure all Rails are in same level.
5.Install the solar panel on the Rails with the End Clamp and Mid Clamp, lock the bolt tightly.