English
English
Français
한국어
日本語
IndonesiaName
Polski
Deutsch
Português
Español
Tiếng ViệtThanks for Your Inquiry, We will Get back to You within 8 Working Hours!
Market feedback in February 2026 supports what many industry veterans sensed late last year: solar is entering a 'sorting year.' The market is moving fast toward execution quality, bankability, and delivery reliability, leaving behind the era where headline GW numbers were the only metric that mattered.

For the first time in a decade, global PV demand is not a simple 'up-and-to-the-right' curve. Developers and EPCs are involving structural partners earlier. They want to lock in compliant hardware and bankable manufacturers before they even finalize construction dates.
At XIAMEN ZIYUAN ENERGY TECHNOLOGY CO., LTD., we see that the value of a supplier is no longer just about the lowest bid. It's about combining a competitive price with stamped structural calculations and predictable lead times. For any serious project in 2026, a generic racking proposal is now seen as a project risk, not a saving.
North America and Europe remain key focus markets. Recent updates show steady demand despite policy discussions. We're getting more inquiries for solar carports and roof mounting as land and rooftop space gets tighter worldwide.
We've heard the same from Middle East ground-mount projects and SE Asia carports — EPCs want proven structural calcs, not just sales brochures. We've supported professional designs for 5200+ PV projects across 80+ countries already.
Across markets, buyers are putting more weight on a few clear design priorities in early 2026. Labor is expensive and schedules are tight, so the 'cost per ton' is being replaced by the 'man-hours per kW' metric.
| Priority | What Buyers Ask | Ziyuan Solution |
|---|---|---|
| Installation | Man-hours per kW? | Pre-assembled kits (proven to save time on-site) |
| Compliance | JIS/ASCE/Eurocode calcs? | Full stamped structural reports |
| Durability | 20yr coastal life? | 80µm HDG or anodized aluminum |
We're also seeing more adjustable ground structures for tricky terrain. These aren't fancy gimmicks — they're practical tweaks that cut on-site fabrication and keep installers from making costly mistakes.
One of the clearest changes we observe is risk caution. Inquiries now frequently ask about backup production options, spare parts availability, and how site deviations from design drawings will be handled. In a year where not every project will be built, mounting suppliers that help de-risk the project are the ones winning the tender.